This project involved removing an old distribution board in a church, installing a new up to date distribution board and doing an Electrical Inspection Condition Report (EICR) on the whole installation. This project took four days to complete, two days changing the board and two days to do the EICR. The new distribution board had much better protection installed for all circuits and ensured it was safe to work on the distribution board whilst leaving another distribution board in the building live.